    Update on the SJP works

    Thought I'd start a new thread for visitors etc to keep up to date on what's happening at SJP

    https://www.exetercityfc.co.uk/news/...pdate-21-june/

  2. #2
    HH12's Avatar
    Join Date
    Mar 2013
    Location
    Devons No 1
    Posts
    2,532

    Re: Update on the SJP works

    Hopefully this thread won't descend into the farce of the 'Stadium Works' thread. Can we just celebrate the progress the club is making and look forward to the end product - please enjoy.
    Dont' worry about the money , the average cost of a seat , contracts , Yelvertons , who said what , when and why , height of the changing room roof , the toilets, the away end , the 'at no cost to the club' etc etc etc.
    Let's leave it to those involved who have got it this far and not pretend we know more and could have done better.

    Over and out

  3. #3
    exeweb.com admin Hants_red's Avatar
    Join Date
    May 2007
    Location
    Hants
    Posts
    34,921

    Re: Update on the SJP works

    Any pics from those looking at the seats in the OG today?

  4. #4

    Join Date
    Apr 2004
    Location
    Ottery
    Posts
    2,356

    Re: Update on the SJP works

    Looking at those photos (very welcome I must say) it looks like a very easy place for a thief to enter the ground with the away wall being lowered as it has been. Secondly, why did the weatherproofing of the IP Office Main Stand need to be done does anyone know? Lastly, when is demolition scheduled for of the OG as there appears to be an awful lot of work to be done as it is regards changing rooms and toilet facilities etc.?

  5. #5

    Re: Update on the SJP works

    Quote Originally Posted by Saint James View Post
    why did the weatherproofing of the IP Office Main Stand need to be done does anyone know?
    As far as i know, the weatherproofing only had to be done where the changing rooms are going as water presumably leaked down through the terracing.

  6. #6
    richard_portland's Avatar
    Join Date
    Sep 2006
    Location
    Enjoy the good times, they don't last forever.
    Posts
    12,187

    Re: Update on the SJP works

    Think the club said the o.g wasn't coming down until October or November.

  7. #7

    Re: Update on the SJP works

    Quote Originally Posted by LOG View Post
    As far as i know, the weatherproofing only had to be done where the changing rooms are going as water presumably leaked down through the terracing.
    is the correct answer. Where the vertical face of the prefabricated concrete sections, meet the horizontal faces of the sections below, there are gaps. In wet and windy weather, water on the horizontal section is blown through these gaps into the areas below.

  8. #8
    Grecian2K's Avatar
    Join Date
    Mar 2004
    Location
    We are the grandchildren of apes, not angels
    Posts
    20,909

    Re: Update on the SJP works

    Quote Originally Posted by Colesman Ballz View Post
    is the correct answer. Where the vertical face of the prefabricated concrete sections, meet the horizontal faces of the sections below, there are gaps. In wet and windy weather, water on the horizontal section is blown through these gaps into the areas below.
    So that's the showers sorted then. Saves a lot of copper piping and heating costs.

    Move a few of the OG seats in and that's the changing room benching sorted as well.

    G2k - saving ECFC a fortune!

  9. #9
    Pete Martin (CTID)'s Avatar
    Join Date
    Apr 2004
    Location
    King's Landing
    Posts
    9,709

    Re: Update on the SJP works

    Quote Originally Posted by Saint James View Post
    Looking at those photos (very welcome I must say) it looks like a very easy place for a thief to enter the ground with the away wall being lowered as it has been. Secondly, why did the weatherproofing of the IP Office Main Stand need to be done does anyone know? Lastly, when is demolition scheduled for of the OG as there appears to be an awful lot of work to be done as it is regards changing rooms and toilet facilities etc.?
    The boundary wall will be surmounted by new, sound, and more aesthetically acceptable fencing.

    The work on demolishing the structure of the OG is not scheduled to start until the second week in November. The new stand is not scheduled to be opened for use until October 2018.

  10. #10

    Join Date
    Mar 2004
    Location
    Avondale (Near Phoenix) Arizona, USA.
    Posts
    15,086

    Re: Update on the SJP works

    Quote Originally Posted by Pete Martin (CTID) View Post

    The work on demolishing the structure of the OG is not scheduled to start until the second week in November. The new stand is not scheduled to be opened for use until October 2018.
    So we'll have a three sided ground for two seasons?